Vacuum pumps for environmental and new energy duty

Environmental and new energy duties look far apart, but they share one condition: the gas handled is not clean. Dust, condensables and corrosive traces reach the pump chamber and the only question is how soon capacity drops — so filtration and selection are decided together.

Central vacuum cleaning systems

Where workshop cleaning, machine-side extraction and charging points share one vacuum source, the main pump is sized on simultaneous points and total pipe run, not by adding up single-point peaks.

  • Size pipe bore by working back from the allowed pressure loss, not from habit; step the bore up from main to branch and use large-radius bends.
  • Put drains at low points; for wet cleaning add a water separator ahead of the pump.
  • With heavy dust, a cyclone pre-separator plus fine filter ahead of the main pump, both with differential pressure gauges — change elements on pressure, not on the calendar.

Powder and material conveying

Conveying needs flow and a steady vacuum, not an ultimate pressure. Points that matter:

  • Convert throughput into required air flow, then add 30 to 50 percent for material build-up and blocked lines.
  • Intermittent conveying (suck, then discharge) makes start frequency the deciding factor: for frequent starts go one size up with a buffer vessel, so the motor is not started repeatedly.
  • With abrasive powders the inlet filter and pipe bends wear first; leave inspection openings.

Battery production

The vacuum steps in lithium battery production are mainly cell and electrode drying, chamber evacuation before electrolyte filling, and degassing after filling.

StepGas conditionSelection
Cell / electrode dryingHigh water vapour, continuousOil-sealed vane pump with gas ballast, condenser and water separator; or a dry claw pump
Chamber evacuation before fillingClean, cycle-drivenOil-free vane or dry claw pump, sized on chamber volume and cycle
Degassing after fillingElectrolyte vapour, condensableOil-sealed model with cold trap and shortened oil change; dry pump where oil is unacceptable
Central works vacuumMultiple points, continuousCentral system with interlocked rotation of pumps

Electrolyte vapour changes the oil directly: viscosity and lubricity both shift once absorbed, so the oil change interval has to follow the actual medium rather than a generic table.

Photovoltaic and coating steps

Laminator evacuation and the backing stage of coating or PECVD lines need controllable pump-down time and no oil mist in the chamber. Lamination commonly uses a multi-stage roots set for fast roughing; coating lines use a single- or two-stage oil-sealed vane pump as backing pump. The ratio is set by chamber volume, target pressure and the backing pump’s speed at that same pressure.

Common accessories

  • Inlet filtration: mandatory in dusty duty, changed on differential pressure.
  • Water separator and cold trap: mandatory where vapour and condensables are present.
  • Buffer vessel: absorbs peaks in intermittent and shared use.
  • Exhaust treatment: oil mist separator on oil-sealed models, with separate ducting.

Send the process step, gas composition, cycle time and site supply and an engineer will return a model and accessory list. Some models are not suitable for 60 Hz regions; please confirm with us before ordering.

Related pages

Frequently asked questions

Why fit a cold trap on battery degassing after electrolyte filling?
Electrolyte vapour is condensable. Drawn straight into the chamber it dissolves in the oil and both viscosity and lubricity shift, so capacity falls. A cold trap condenses the condensable fraction first; the oil change interval then follows the actual medium, not a generic table.
What vacuum level does powder conveying need?
Conveying runs on flow and a steady vacuum, not on ultimate pressure. Convert throughput into air flow and add 30 to 50 percent for material build-up and blocked lines. Intermittent conveying also makes start frequency a factor: with frequent starts go one size up and add a buffer vessel.
Why two filtration stages on a central cleaning system?
Dust reaching the chamber is the fastest route to vane wear. A cyclone knocks out the coarse fraction and a fine filter catches the rest, each with a differential pressure gauge, so elements are changed on pressure rather than on the calendar — workshop cleaning dust varies too much for a fixed interval.

Need a model recommendation or a quote?

Tell us the required pumping speed, ultimate pressure, gas handled, dust and corrosion conditions, duty cycle and power supply; we will size the model for your process.

Contact us