Pressure loss in a central vacuum system usually shows up after commissioning: the gauge at the pump reads 400 mbar while station eight runs at 340 mbar, and suction cups start slipping. The pump was chosen correctly; the piping took the difference. Using an eight-station line as the example, this note walks through the duty list, total flow, main line size, branch size, buffer tank and machine selection in sequence.
1. Duty list: what each station needs
The first sheet in a central vacuum project is not a pump datasheet, it is a station list.
| Station | Duty | Working vacuum | Peak flow (at inlet) | Cycle |
|---|---|---|---|---|
| 1–6 | Cup handling, fixture clamping | 400 mbar abs | 40 m³/h each | 4 s pump, 1 s release |
| 7–8 | Packaging chamber evacuation | 100 mbar abs | 40 m³/h each | 12 s |
Flow is stated at the inlet condition: what the pump displaces per hour at 400 mbar, not the atmospheric equivalent. 40 m³/h at 400 mbar equals 15.8 m³/h at atmosphere. The two figures differ by 2.5 times, and pipe diameter must follow the first one.
2. From station flow to main line flow
All eight stations running at once demand 6 × 40 + 2 × 40 = 320 m³/h. Stations normally alternate, so with a simultaneity factor of 0.6 the average system flow is 192 m³/h. The pump is sized on average flow, peaks are covered by the buffer tank and a standby machine — the usual approach for central vacuum, described in multi-station central vacuum.
The 0.6 factor is an assumption, not a constant. Where all stations are triggered by one signal and move in sync, use 1.0, size the pump for 320 m³/h and go one nominal size larger on the main line.
3. Main line size: vacuum pipe sizing and velocity
Assume a 30 m main with six 90° elbows and two ball valves, carrying 300 m³/h at 400 mbar, dry air at 20 °C, density 0.475 kg/m³ (39% of the atmospheric 1.204 kg/m³). Pressure drop follows Darcy-Weisbach with the Blasius friction factor; elbows count as 20 diameters of equivalent length, ball valves as 3.
| Nominal size | Bore | Velocity | Reynolds number | Pressure drop | Share of 400 mbar |
|---|---|---|---|---|---|
| DN50 | 44 mm | 54.8 m/s | 6.3×10⁴ | 115 mbar | 28.8% |
| DN65 | 59 mm | 30.5 m/s | 4.7×10⁴ | 30 mbar | 7.5% |
| DN80 | 74 mm | 19.4 m/s | 3.8×10⁴ | 10.8 mbar | 2.7% |
| DN100 | 94 mm | 12.0 m/s | 3.0×10⁴ | 3.7 mbar | 0.9% |
Keeping the main line loss within 5% of working pressure is the common target. DN50 is out: 115 mbar over 30 m leaves the far end below 300 mbar. DN65 at 30 mbar (7.5%) is tight. DN80 lands at 10.8 mbar (2.7%), leaving 389 mbar at the last station.
The velocity column tells the same story: DN80 runs 19.4 m/s, inside the usual 15–30 m/s band for mains, while DN50 at 54.8 m/s brings noise, elbow erosion and particle entrainment.
4. Branch lines and valves
A correct main can still be ruined at the branch. One station at 40 m³/h, branch 8 m long with three elbows and one ball valve:
| Branch size | Velocity | Pressure drop (8 m) | Share of 400 mbar |
|---|---|---|---|
| DN25 | 35.4 m/s | 37.3 mbar | 9.3% |
| DN32 | 19.4 m/s | 9.4 mbar | 2.3% |
| DN40 | 11.5 m/s | 2.9 mbar | 0.7% |
Branches should be DN32 or larger; long runs with more fittings go to DN40. Many sites step the branch down one size from the pump inlet to fit a flexible hose, and pay thirty-odd millibar at every station.
5. Run the 100 mbar section on its own main
A packaging chamber pulled to 100 mbar should not share a main with 400 mbar holding stations. That section uses DPL-LC250 (250 m³/h, ISO63 inlet, 2.2 kW) backed by DPL-V0100 (100 m³/h, 3.0 kW, G1¼″), a speed ratio of 2.5 with the backing pump working near 250 mbar, well inside the 0.1 mbar ultimate of the V0100. A 25 m DN65 main gives 25.4 m/s and 6.7 mbar, 6.7% of 100 mbar — too much; DN80 brings it to 16.1 m/s and 2.4 mbar. Pump data for the booster range is on the Roots vacuum pump page.
Sharing one main has a calculable cost: whenever the packaging chamber starts pumping, the whole main is pulled down and the six holding stations lose vacuum mid-transfer.
6. Buffer tank sizing
Tank volume comes from peak flow minus pump flow, multiplied by cycle time, divided by the permitted pressure swing. With a 200 m³/h pump (one DPL-V0202) and all eight stations moving for 4 s, the shortfall is 120 m³/h × 4 s = 0.133 m³ at 400 mbar, or 0.053 m³·bar.
| Tank | Pressure rise |
|---|---|
| 1.0 m³ | 53 mbar |
| 1.5 m³ | 36 mbar |
| 2.0 m³ | 27 mbar |
Either a 1.5 m³ tank, or DPL-V0302 at 300 m³/h where the shortfall drops to 20 m³/h and a 1 m³ tank rises only 9 mbar. First pump-down of a 1 m³ tank from atmosphere to 400 mbar takes about 11 s with the V0302 and 17 s with the V0202, from t = (V / S) × ln(p₀ / p₁); the calculator handles the arithmetic.
7. Machine configurations
| Option | Pump | Speed (50/60 Hz) | Power | Ultimate | Inlet | Tank and main | Where it fits |
|---|---|---|---|---|---|---|---|
| A decentralised | 8 × DPL-V0040A | 40 / 48 m³/h | 1.5 kW | 0.1 mbar | G1¼″ | none | few stations, no expansion planned |
| B single central | DPL-V0302 | 300 / 360 m³/h | 7.5 kW | 0.1 mbar | G2″ | 1 m³ tank, DN80 main | the 400 mbar section here |
| C duty/standby | 2 × DPL-V0202 | 200 / 240 m³/h | 5.5 kW | 0.1 mbar | G2″ | 2 m³ tank, DN80 main | lines that cannot stop |
| D with booster | DPL-LC250 + DPL-V0100 | 250 + 100 m³/h | 2.2 + 3.0 kW | see product page | ISO63 / G1¼″ | DN80 main | 100 mbar section, higher flow |
| E oil-free | DPL-ZS150 | 140 / 175 m³/h | 3.5 kW | 60 mbar | G2″ | 1 m³ tank, DN65 main | clean exhaust, stations above 100 mbar |
Option A installs 12 kW against 7.5 kW for option B; the difference sits in machine count and simultaneity, not in pump efficiency. The ZS150 has an oil-free pumping chamber (0.85 L of oil in the gearbox only) and a 60 mbar ultimate, which limits it to stations at 100 mbar and above. Processes at the 10 mbar level need oil-sealed vane pumps or a Roots set; the comparison is on the central vacuum systems page, and packaged configurations are listed under packaged pump units.
Check supply frequency separately: 50 Hz and 60 Hz speeds differ — V0302 is 300 / 360 m³/h, ZS150 is 140 / 175 m³/h. The specification sheet notes that some models are not suited to 60 Hz regions; confirm motor and speed configuration with the factory before ordering, and recalculate main line and tank for the target frequency.
8. Six common mistakes
- Sizing pipe on atmospheric flow. 40 m³/h at 400 mbar is 15.8 m³/h at atmosphere; DN25 looks fine at 14 m/s atmospheric, but runs 35.4 m/s and loses 37 mbar at 400 mbar.
- Counting straight pipe only. Six elbows and two ball valves add about 9 m of equivalent length to a 30 m main, roughly a third more loss.
- Stepping the branch down from the pump inlet. A DN25 hose on a G2″ pump outlet costs thirty-odd millibar at every station.
- Mixing vacuum levels on one main. Packaging evacuation drags the holding stations down mid-transfer; split the mains and the machines.
- No check valve between tank and pump. Vacuum empties through the pump at standstill, and restart costs 11–17 s of pump-down.
- Ignoring leakage. Joints, valve packing and quick couplings all leak; after designing for 5% loss, pressure-test the line and check every joint.